BIM实验研究中心

位置: 首页 > 科研成果 > 期刊论文 > 正文

BIM中心2017年期刊论文汇总

BIM中心 发表于: 2019-09-12 08:40 点击:[]

[1] Clyde Zhengdao Li, Geoffrey Qiping Shen, Xiaoxiao Xu, Fan Xue, Lucila Sommer, Lizi Luo. Schedule Risk Modelling in Prefabrication Housing Production. Journal of Cleaner Production. 153: 692-706(2017)(SCIJCR一区)  

[2] Clyde Zhengdao Li, Ray Y. Zhong, Fan Xue, Gangyan Xu, Ke Chen, George Guoquan Huang, Geoffrey Qiping Shen, Integrating RFID and BIM technologies for mitigating risks and improving schedule performance of prefabricated house construction. Journal of cleaner production. 165:1048-10622017(SCIJCR一区)  

[3] Jingke Hong; Clyde Zhengdao Li*; Qiping Shen; Fan Xue; Bingxia Sun; Wei Zheng. An Overview of the Driving Forces behind Energy Demand in China`s Construction Industry: Evidence from 1990 to 2012. Renewable & Sustainable Energy Reviews. 73: 85-94 (2017). (SCI,JCR一区)  

[4] Zheng, W., G. Q. Shen, H. Wang, J. Hong and Clyde Zhengdao Li* (2017). "Decision support for sustainable urban renewal: A multi-scale model." Land Use Policy 69(Supplement C): 361-371. (SSCI,JCR一区)  

[5] Cheng Fan, Fu Xiao*, Yang Zhao. A short-term building cooling load prediction method using deep learning algorithms. Applied Energy. 2017, 195: 222-233.  

[6] Cheng Fan, Fu Xiao*. Mining big building operational data for improving building energy efficiency: A case study. Building Services Engineering Research and Technology. 2017, 39:117-128.  

[7] Ding Zhikun, Wang Jiayuan, Zuo Jian, Gong Wenyan. Key performance indicators for regional construction supervision systems in China [J]. Engineering management journal, 29(3) pp.179-188, 2017, EI,SSCI(Q4),SCI(Q4)  

[8] Y. Tan, Y. Song, X. Liu, X. Wang, J.C.P. Cheng*, 2017. A BIM-based framework for lift planning in topsides disassembly of offshore oil and gas platforms. Automation in Construction 79, 19-30. (JCR Q1IF=4.032)  

[9] J.C.P. Cheng, Y. Tan*, Y. Song, X. Liu, X. Wang, 2017. A semi-automated approach to generate 4D/5D BIM models for evaluating different offshore oil and gas platform decommissioning options. Visualization in Engineering, 5: 12.

[10] Liao, L.*, and Teo, E.A.L. (2017). Critical success factors for enhancing the building information modelling implementation in building projects in Singapore. Journal of Civil Engineering and Management, 23(8), 1029-1044.  

[11] Liao, L.*, Teo, E.A.L., and Low, S.P. (2017). A project management framework for enhanced productivity performance using building information modeling. Construction Economics and Building, 17(3), 1-26.  

[12] Duan, H., Li, J., Liu, G. Developing countries: Growing threat of urban waste dumps. Nature, 2017, 546(7660), 599.  

[13] Yu, D., Duan, H.,* Song, Q., Liu, Y., ...& Wang, J. Characterization of brominated flame retardants from e-waste components in China. Waste Manage. 2017, 68, 498-507. (SCI, IF: 4.02)(JCR-2)  

[14] Song, Q.*, Wu, Y., Li, J., Wang, Z., Yu, D., & Duan, H.* Well-to-wheel GHG emissions and mitigation potential from light-duty vehicles in Macau.  Int J. Life Cycle Assess. 2017, 1-12. (SCI, IF: 3.17) (JCR-2)  

[15] Mao, R., Duan, H.,* Dong, D., ...& Dong, B. Quantification of carbon footprint of urban roads via life cycle assessment: Case study of a megacity- Shenzhen, China. J. Clean. Prod. 2017, 166, 40-48. (SCI, IF:5.72) (JCR-2)  

[16] Song, Q. *, Wang, Z., Duan, H. *, Li, J. Characterizing the transboundary movements of UEEE/WEEE: Is Macau a regional transfer center? J. Clean. Prod. 2017, 157, 243-253. (SCI, IF:5.72) (JCR-2)  

[17] Duan, H.*, Hu, M., Zuo, J., Zhu, J., Mao, R., Huang, Q. Assessing the carbon footprint of the transport sector in mega cities via streamlined life cycle assessment: a case study of Shenzhen, South China. Int J. Life Cycle Assess. 2017, 22, 683-693. (SCI, IF: 3.17) (JCR-2)  

[18] Zheng, L., Wu, H., Duan, H.*, Dong, B. Characterizing the generation and flows of construction and demolition waste in China. Constr. Build. Mater. 2017, 136, 405-413. (SCI, IF: 3.17) (JCR-2)  

[19] Yani LAI*,  Jiayuan Wang  and Waiming Lok. (2017). “Redefining property rights over collective land in the urban redevelopment of Shenzhen, China”. Land Use Policy69485-493.  

[20] Yani LAI,  Xian Zheng,  Lennon Choy and Jiayuan Wang. (2017). “Property rights and housing prices: An empirical study of small property rights housing in Shenzhen, China”. Land Use Policy68:429-437.  

[21] Yani LAI*,  Edwin Chan  and Lennon Choy. (2017). “Village-led land development under state-led institutional arrangements in urbanizing China: The empirical case of Shenzhen”. Urban Studies54(7):1736-1759  

[22] Xue H, Zhang S, Su Y, Wu Z, Factors Affecting the Capital Cost of Prefabrication-A Case Study of China, Sustainability 9 (2017).  

[23] Wu Z, Yu ATW, Shen L, Investigating the determinants of contractors construction and demolition waste management behavior in Mainland China, Waste Manage. 60 (2017) 290-300.  

[24] Huo X, Yu ATW, Wu Z, A comparative analysis of site planning and design among green building rating tools, J. Cleaner Prod. 147 (2017) 352-9.  

[25] Hossain MU, Wu Z, Poon CS, Comparative environmental evaluation of construction waste management through different waste sorting systems in Hong Kong, Waste Manage. 69 (2017) 325-35.  

[26] Hu, M. (2017). A high-fidelity three-dimensional simulation method for evaluating passenger flow organization and facility layout at metro stations. Simulation, 93(10), 841-851.  

[27] Hu, M., Huang, W., Cai, J., & Chen, J. (2017). The evaluation on liquefied natural gas truck promotion in Shenzhen freight. Advances in Mechanical Engineering, 9(6), 1687814017705065.  

[28] Yu, M.*, Lee, C.-Y. and Wang J.J.“The regional port competition with different terminal competition intensity”, Flexible Services & Manufacturing Journal, 2017.12, 29(3-4): 659-688.  

 

上一条:BIM中心2016年期刊论文汇总 下一条:BIM中心2018年期刊论文汇总

关闭

深圳大学 土木与交通工程学院

中澳BIM与智慧建造联合研究中心/深圳大学建筑互联网与BIM实验中心

地址:广东省深圳市南山区深圳大学南区土木与交通工程学院2楼

邮编:518060   电话:0755-26535528

中心公众号

网站访问量: